espresso coffee machine - instructions for technician
2. PREPARATION OF THE MACHINE
2.1 UNPACKING
Open the packaging, taking care not to damage it. Remove the
machine protections and the equipment contained in the package.
If there is an external motor pump, the motor and the pump are
provided in separate packaging.
2.2 EQUIPMENT PREPARATION
Motor pump
In machines with an external motor, it is necessary to prepare
Fit the 3/8 gas connection with filter
(arrow ) and the plain 3/8 connection
Attention: install the connection with filter
To correctly couple the pump and motor, use the appropriate
. Lock all of this with the two
The pump-motor joint is also installed in machines with an internal
motor, with the exception of the Junior version and the Zecchin
In the housing of the filter holder
, place the filter clamp spring
firmly into the filter holder.
Complete the filter holder by installing the two-cup
In Italy provide for an extension cord
Attention: install the spout on the relative filter holder: one-cup
spout on one-cup filter, etc.
The resin softener is standard equipment on versions AEAP-SMAT
and SAE-SME. It is furnished on request in versions AL-SMMA
On request, an automatic resin softener is supplied.
The “Multi Head” anti-lime scale device is provided on request and
is installed directly on the hydraulic circuit of the machine.
For further information, refer to the “Softeners” chapter.
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
(arrow ) and the plain 3/8 connection
Comments to this Manuals